Thursday, 7 March 2013

MS program at IIT- Madras in collaboration with the world’s leader in Analog, Texas Instruments.


Hi Frndz this is to inform u about

Research Associateships in Analog and Mixed Signal VLSI Design

IIT Madras invites applications from motivated candidates for research associate positions working on cutting edge research in the area of analog and mixed signal VLSI design, in the Department of Electrical Engineering. This programme is a joint initiative by IIT Madras and Texas Instruments India Pvt Limited ("TII") which brings together expert faculty and a strong academia-industry interface. Research associates will be eligible for admission in the Master of Science (MS) Programme (by research), subject to the norms and admission criteria of IIT Madras.
Features of this programme
  • Associates in this programme will work on relevant industrial problems, and will have the opportunity to intern at TII. The research will be supervised jointly by faculty from IIT Madras and TII.
  • Candidates will be selected based on a written test and interview conducted by IIT Madras.
  • The selected students will receive minimum emoluments of Rs. 20,000/- per month throughout the programme.
  • The students selected to the program will receive a provisional non binding employment offer from TII at the time of joining the course.
Apply if you
  • Want to work on challenging projects in Analog/Mixed Signal IC Design
  • Are passionate about circuit & system design
  • Want to design and fabricate your own IC and see it work!
To apply, you must
  • Have a Bachelor's degree in Electronics/Electrical/Telecommunications engineering (or allied disciplines) with an aggregate of 65% (up to the final semester; if the final semester results are not yet announced, up to the seventh semester).
  • Have scored at least 650 out of 1000 in GATE(EC or EE in 2012 or 2013).
The coordinators of this research programme have the discretion to restrict the number of candidates to be called for the interview to a reasonable limit on the basis of qualifications and experience higher than the minimum described in this announcement.

To proceed further

  •  Application site will be open on March 15th

Important dates

  • Applications will be accepted from 15th March 2013. The application form will be inaccessible till then.
  • Last date for submitting applications: 29th March 2013 (The website will close at 5pm)
  • Notification to shortlisted candidates: 31st March 2013 (Email notification will be sent to the address provided).
  • Test and Interview: 15th April 2013, at the Dept. of Electrical Engg. IIT Madras.


    For Further Info Go through this link:
    there by U'lll have clear Idea Regarding this...

Wednesday, 27 February 2013

Internship @IIT Rajasthan..


Hi guyz this Is Details regarding Internship @IIT Rajasthan...



IIT Rajasthan, one of the new 8 IITs being set up, invites applications from Masters and Bachelors students to carry out the research project under Undergraduate Research and Innovation (UGRI) Program to nourish research and innovation among the students. The last date for application is 20th March 2013 – hurry!
About Internship: - It’s an academic research internship under which students undertake focused research projects at IIT Rajasthan. The list of projects available as part of this program is available along with the application form.
Who can apply: - Students must have completed 5 semesters of B.E/B.Tech/Dual Degree program or 1st year of M.Sc/M.A. Student must have scored 70% (or 7.5 CPI) if in Engineering stream, and 65% (or 7 CPI) if in Science stream. In addition, an applicant must have scored >60% through out his/her academic career
Location: - IIT Rajasthan, Jodhpur, India
Duration: - 10 Weeks (May 6th – July 10th, 2013)
Stipend: – INR 8,000/- per month + Rs. 1,000 for poster and interim reports preparation
How to apply: - Please refer to IIT Rajasthan UGRI 2013 (http://www.iitj.ac.in/ugri.html ) Page for more info and application details. The last date for application is 20th March 2013 – hurry!

Internship @MASAUM network

Hi Frndz this is to inform about Internship @ MASAUM Network


MASAUM Network http://www.masaumnet.com is one of the leading publishers and event organizers in the world.

MASAUM Network has started internship program for university students and graduates.There is no restriction on citizenship of the applicants and field of study of the applicants.

Please visit http://www.masaumnet.com/internships.html for details.

For more information please contact at masaum.internships@gmail.com.

Friday, 22 February 2013

BHEL recruitment through gate 2013 - Hiring for 500 Engineering Graduates

BHEL 2013 recruitment for Engineer Trainees through GATE 2013 


Hi frndz this is information Regarding BHEL 2013 Recruitment....
Online Applications are invited from inspiring and motivated Graduate Engineers by Bharat Heavy Electricals Limited (BHEL) for filling upto 500 Engineer Trainee post in various disciplines. Eligible Candidates aspiring for this post may apply via Online Submission. For Further Detailed information of this recruitment through GATE 2013 is provided given below. 

Vacancy Details - 500 posts (Engineer Trainee : Mechanical 300 vacancies, Electrical 150 vacancies, Electronics – 50 vacancies)

Education Qualification : Candidates should have Bachelor's Degree in Engineering from any recognized University. Candidates need to take GATE 2013 Engineering Aptitude Test. 

Age Limit : Candidates age should be between 20 yrs to 27 yrs. Age Relaxation for SC/ST candidates will be 5 yrs and 3 yrs for OBC candidates. 

Pay Scale : During One year Training period, Candidates will get Rs 20,600 - 46,500 and then Rs 24,900 - 50,500. 

List of PSUs recruiting through GATE 2013

Hi Frndz this is to inform u that
Applications are invited by various PSU's for their recruitment through GATE 2013. Here, we have listed PSU's with the number of vacancies, eligibility criteria, important dates & the package offered.




Name of PSUNumber of VacanciesStreams EligibleImportant DatesCTC
Power GridNAEE7Th Jan ~ 8th Feb 201312.7 Lakhs PA
IOCL400CE, CH, CS, EE, IN, EE, ME and Metallurgy10 Dec 12′ ~ 19 Jan 13′
MECL20ME1 Jan ~ 31 Jan 20135 Lakhs PA
DDANACE, EE, ME24 Dec 12′ ~ 14 Feb 13′5 Lakhs PA
BEL India150EC, ME, CS28 Dec 12′ ~ 14 Feb 13′5 Lakhs PA
GAIL117ME, EE, CH, IN6 Dec 12′ ~ 15 Jan 13′5 Lakhs PA
BPCLNAME5 Dec 12′ ~ 9 Feb 13′10 Lakhs PA
BHEL500ME, EE, EC1 Jan ~ 31 Jan 13′8 ~ 9 Lakhs PA
NTPCEE(60),ME(100),CE(15),Inst(17), EC(17)EE, ME, CE, IS, EC10 Dec 12′~ 30 Dec 12′~8.50 Lakhs PA
HPCL250ME, CE, EE, EC, IS24 Dec 12′~ 14 Feb 13′~8.50 Lakhs PA
BARCNA
DVCNAEE, ME, EC, IC, CS

Tuesday, 19 February 2013

GATE 2013 ME Paper

Hi frndz this iz our GATE EE 2013 paper...













































If u Want to download Full paper of GATE 2013 EE... 
Visit this below link and there by U can download it easily..

Key For GATE 2013 ME Paper..

Hi frndz this iz the key for GATE ME 2013 Paper
Prepared by ACE ACADEMY..
If u want to download ket for all sets of ME Paper Go through this below link
There by U can download it easily...

Click this link For KEY

Monday, 18 February 2013

Key for Gate 2013 EE Paper

Hi frndz this iz the key for GATE EE 2013 Paper
Prepared by ACE ACADEMY..
If u want to download ket for all sets of EE Paper Go through this below link
There by U can download it easily...

Click this link for ur Key

GATE 2013 EE Paper


Hi frndz this iz our GATE EE 2013 paper...



If u Want to download Full paper of GATE 2013 EE... 
Visit this below link and there by U can download it easily..

Key for Gate 2013 CS & IT Paper

Hi frndz this iz the key for GATE CS & IT 2013 Paper
Prepared by ACE ACADEMY..
If u want to download ket for all sets of CS & IT Paper Go through this below link
There by U can download it easily...

Click this link for Key

Gate CS & IT 2013 paper

Hi frdz this is our GATE CS&IT 2013 paper...


If u Want to download Full paper of Gate CS & IT 2013... 
Visit this below link and there by U can download it easily..

Sunday, 17 February 2013

Gate EC 2013 Paper with Solutions

Hi guyz this is the Gate EC 2013 paper with full solutions Prepared by Our GATEFORUM....



Click this below linlk and there by U can download it easily...

Click this link to download

Gate IN 2013 Key

Guyz this is the Key for GATE IN 2013 PAPER
Prapared by ACE ACADEMY...

Click here to Download key of In 2013 Gate paper...

Click this Gate IN 2013 Key's Link

Gate 2013 IN paper

Hi Guyz this is our Gate IN 2013 paper...



If u Want to download Full paper of Gate IN 2013... 
Visit this below link and there by U can download it easily...

Wednesday, 13 February 2013

Key for Gate EC 2013 paper...

Guyz this is the Key for GATE EC 2013 PAPER
Prapared by ACE ACADEMY...

Click here to Download key of EC 2013 Gate paper...

Click this link for EC2013 key

Gate 2013 EC paper...

Hi Guyz this is our Gate EC 2013 paper...









If u Want to download Full paper of Gate EC 2013... 
Visit this below link and there by U can download it easily...


Thursday, 3 January 2013

Online event @IITM


Hi guyz this is to inform u about the annual algorithmic online programming contest of the Indian Institute of Technology, Madras. It is being conducted as part of the institute's technical festival, Shaastra.
Total prize money worth Rs 80,000 to be won!
Time: 5th Jan 21:00 hrs to 6th Jan 1:00 hrs IST
Languages: C, C++, Java
Event page:http://www.shaastra.org/2013/main/#!events/online-programming-contest
Click here to find out when the event begins in your respective time zones:
Click Here to see Timings @Different Locations

Electronica2k13, G.Pulla Reddy Engineering College , Kurnool, Technical Fest,March 9-10 2013

Hi guyz this is to inform u regarding technical fest @
G. Pulla Reddy Engineering College


Fest dates: 9th-10th M arch 2013


Electronica2k13 is a Two Day National Level Technical Fest organised by Department of
Electronics and Communication Engineering...
Electronica2k13 Technical Events in Kurnool :
Paper Presentation
Poster Presentation
Workshop
Technical Quiz
Techno Picture Identification
Robo Mania
And Many More Spot Events


For more Details Visit this below link:

Click This GPREC's Link

Monday, 31 December 2012

C-Quiz And Programming Contest 2013, Audisankara College of Engineering and Technology, Gudur, Technical Fest

Hi Guyz this is to inform u regarding technical fest @Audisankara College





Fest dates: 5th January 2013

Last Dates for Registration: Spot registrations are available
Details:
We Are Very Glad To Invite You To Participate In C-Quiz & Programming Contest,
Organized By The Department Of Computer Science & Engineering On 5th January 2013.


For more Details visit this Website...
http://www.audisankara.com

Saturday, 29 December 2012

Process to make IDM full Version

Hi Guyz this is the best process  To make Ur IDM as Full Version..



1. Download and Install the latest version IDM and open it.
2. Navigate to  "C:\Windows\System32\drivers\etcon your computer.
3. In the "etc" folder you will find a file with name "hosts"
4. Now right click on the Hosts file and choose "properties" and Navigate to "security" tab on the property window.

5. Now click on "Advanced" and Navigate to "owner" tab on the Advanced Security Option.
6. Click on "edit".
7. A new window will be opened. There you will find a table asking for "change Owner to". Now change there to your local user on which you logged on.(e.g. USER-PC or anything on your system. Not the Administrator user)
8. Below that you will find an check box "replace owner on sub containers and objects".
9. Just tick the check box.
10. Now apply all the modified setting. During apply the changes it will show an message "You dont have the permission to read the file or the contents of the directory. Do you want to change the permission of the file or folder to full control. All permission will be replaced if you press ok". Just Ignore the message and press OK.
11. Now again Right click of mouse on the "Hosts" file and choose "properties" then Navigate to "security" tab.
12. Now click On "Edit" on the  "Group or User Names" section.
13. A new window for permission will be opened.In the permission window choose the logged or local user and  in the "Permission For User"  tab  tick on "Full Control".
14. Now apply those changes. And click on "ok"
15. Now open the "Hosts" file with notepad and Copy the below bold letters and paste it in the hosts file.

127.0.0.1 tonec.com
127.0.0.1 www.tonec.com
127.0.0.1 registeridm.com
127.0.0.1 www.registeridm.com
127.0.0.1 secure.registeridm.com
127.0.0.1 internetdownloadmanager.com
127.0.0.1 www.internetdownloadmanager.com
127.0.0.1 secure.internetdownloadmanager.com
127.0.0.1 mirror.internetdownloadmanager.com
127.0.0.1 mirror2.internetdownloadmanager.com

16. Now save the hosts file. If you are experiencing difficulty in saving the hosts file then you must learn about take the ownership of the file. After taking the ownership it will be saved easily.

17. Now open Your Installed IDM application.  Click on "registration" on the menu bar and choose "Registration".


18. When you click on registration, Now a new window Will be open ask your First Name, Last Name, Email Address and Serial Key.
19. Enter your First name, Last Name, Email address in the required field. In the serial key field enter any of the following given below
   
     RLDGN-OV9WU-5W589-6VZH1
     HUDWE-UO689-6D27B-YM28M
     UK3DV-E0MNW-MLQYX-GENA1
     398ND-QNAGY-CMMZU-ZPI39
     GZLJY-X50S3-0S20D-NFRF9
     W3J5U-8U66N-D0B9M-54SLM
     EC0Q6-QN7UH-5S3JB-YZMEK
     UVQW0-X54FE-QW35Q-SNZF5
     FJJTJ-J0FLF-QCVBK-A287M

20. And click on ok to register. that is it. Now your latest IDM become full version with the registration.

Friday, 28 December 2012

Wipro Off Campus For 2013 Batch Freshers On 16th Jan 2013 - Wipro WISTA-WASE Program For Graduates


Company Name: Wipro Technologies
Website: www.wipro.com

Qualification: B.Sc, BCA
Experience: Freshers
Location: Punjab
Year Of Passing: 2013 Batch
Off Campus Date: 16th January 2013

Wipro Off Campus For 2013 Batch Freshers - Graduates - WISTA & WASE Program
- On 16th January 2013
Chandigarh Group of Colleges takes this opportunity to invite your prestigious institute to
a “WASE, WiSTA (with Maths) WiSTA (with or without Maths) program being conducted
by Wipro Technologies Ltd. for BCA &B.Sc students of 2013 passing out batch


Salary Details:
11,500 - 1st Academic Year
14,000 - 2nd Academic Year
19,000 - 3rd Academic Year
23,000 - 4th Academic Year
5 LPA - After completion

for details regarding Regestration Click this link:
Click this regestration's Link


Aavartan 2013, NIT Raipur, Technical Fest, Chattisgarh

Information regarding Aavartan 2013,technical fest +NIT Raipur 

Fest dates: 5th January - 3rd M arch 2013

Abstract Submission Starts From 5th Jan, 2013 
And Last Date For Abstract Submission Is: 25th Jan, 2013.


Timeline For Aavartan :
Step 1. Form A Team With M aximum M embers Up-To THREE
Step 2. Choose Any One Problem Statement From Your Department.
Step 3. Submit An Abstract Describing Your Solution For The Problem Latest By 25th
Jan'13
Step 4. Results Will Be Declared Within 5 Days After Abstract Submission Ie By 30th Jan'13.
Step 5. Selected Teams Then Have To Develop A Working M odel/Live Project Based On
Their Abstracts. Time Given Will Be Approx. ONE M onth.
Step 6. Finally An Exhibition Will Be Put Up In Our Campus Where The Winners Will Be
Decided.
Aavartan 2013 Technical Events in Raipur :
An Exhibition Of The Solutions Of The Problem Statements Provided By The Selected Teams

For Regestration & more details visit this official link:

INCIDENT, NIT Karnataka, Surathkal,Cultural Fest, Karnataka


Guyz this is to inform u about 
INCIDENT dates: 
Fest dates: 13th-17th March 2013
Last Dates for Registration: February 28th

Details: Incident Is The Biggest Cultural Fest In Karnataka. It Was First Conducted In 1970 And Has Grown Exponentially In Stature Over The Years To Become One Of The Largest Cultural Festivals In South India. This Edition Of Incident Promises To Be Bigger Than Ever Before. Come, Be A Part Of It.The After Party.


INCIDENT Cultural Events: 
Bandish ( Eastern Musicals)
 Pulse ( Western Musicals )
 Promenade ( Dance ) 
Slam Dunk ( Basketball) 
Beach Events 
Adventure Events
 Lit Events 
Gaming 
Informalz 
Mad Ads 
Photography 
Fashion Show 
Incident Idol 
Incident Theatre 
Auto Expo 
Workshops 
Dj night 
5 Pronites


For more details visit the following link:


Thursday, 27 December 2012

The great Inspirational Story From Interview of Internshala with redBus CEO, Phanindra Sama

“Always look at the glass half full”  Is the themeline of this interview




Sitting across the coffee table, engaged in a free-wheeling chat, I  have to often remind myself that I am in conversation with the CEO of redBus – recently rated as one of the world’s top 50 most innovative companies byFast Company – and the man behind 10Mn+ bus journeys in India; and not an old school friend – such is the ease and warmth of Phanindra Sama’s, popularly known as Phani, personality.
From a shy small town boy from Andhra Pradesh to building a business worth Rs. 300Cr+ in annual revenue and revolutionizing the way India booked bus tickets along the way; Phani is a role model for many. In this candid one on one conversation with Internshala, Phani shares lessons from his journey starting from his college days till date. Read on…
1. During your college days (BITS Pillani, EEE, 1998-2002) what kind of a student were you? Was your primary focus on studies or were you actively involved in extra curricular activities too? Were there any early signs of entrepreneur to be?
When I joined BITS Pilani in 1998, I was rather shy and under confident, primarily because I could not speak English very well. Most of my education back in my town in Andhra Pradesh was in Telugu. However, during ragging I got introduced to a senior who came from the same town and who sort of took to mentoring me.
Upon the advice of this senior I joined the photography club (known as Department of Photography a.k.a DOPy) and was actively involved with it through out 4 years; I was one of the most learned photographer  on the campus and eventually became Head of DOPy in my 4th year.
I did well in studies too. A strong foundation in 11th and 12th meant that first 2 years at BITS Pilani were a breeze when it came to acads; so much so that 7 of us were known as Bewars Gang on the campus – sort of happy go lucky folks who did not study hard yet scored well. Eventually I graduated with a 9+ CGPA.
I believe my stint at DOPy taught me valuable lessons about human psychology and leadership that help me a great deal even today. These lessons, taught in an informal setting with no vested interests on part of the seniors who taught me these, are –
  • As head of the club, I had to manage a team of 50 student volunteer who worked for no pay. And in learning to engage and motivate them, I, for first time, learned nuances of how the organization structure, the parts in a large system, work and the whole equation became clear
  • I learned that while it may be difficult for me to keep track of all 50 members, as a leader my job would become easier if I could identify 4-5  key members in the group and could influence them who in turn could influence all 50
  • Finally, I learned that everyone behaves as per his or her interest, and unless I could align his/her interest with my interests; it would not be possible for me to get work out of the person. This lesson that all of us learn at some stage in our professional lives, I learned during my stint with DOPy
2. During your Engineering, where did you do your internship, what project/assignment did you work on, and how was the overall experience?
In BITS Pilani, one gets to do 2 internships. One at the end of 2nd year summers called Practice School 1 (PS 1) and another 6 months long internship in your final year called Practice School 2 (PS2)
I did my PS 1 with Apollo Hospital, Hyderabad. Strange as it may sound (what would an Engineer do in a hospital?), the internship was a plan by the entire Bewars Gang to be together in Hyderabad during the summer. However, I learned a lot during my internship. It was the time when Apollo Hospital was going for ISO certification and I got to spend 1 week each in every department right from billing, admissions, Operations Theater, maintenance etc.. I realized there was such a huge system (there were 2 basements below hospital where large machines used to run producing Oxygen and what not, along with a large maintenance staff, cafeteria etc.) supporting what may seem a simple doctor-patient transaction.
I did my PS2 at ST Microelectronics in Noida where I worked on designing a Bluetooth controller on ST’s FPGA. It was also a great experience because ever since I joined Engineering, I was very passionate about Electronics and wanted to work on a real project and here I was surrounded by 1,200 people who lived and breathed Electronics.
Another interesting aspect of this internship was that later when I joined Texas Instruments, I realized the cultural differences that exist between an European organization (ST Microelectronics) and a US based organization (TI). In TI focus was always on results while ST was more about Work Life balance – sort of one wasCapitalistic in nature and other was Socialist – it helped me define the work culture at redBus which I think is somewhere in between the two. We are people friendly but we drive the results too.
3. You worked for ~3 years before starting up. Do you think having prior corporate experience helps one in starting up? If yes, in what ways?
Oh yes, absolutely! I will give you a real life example.
Another friend of mine who stayed back at BITS Pilani for his Masters started his company right after the college around the same time we did.While we at redBus adopted an open office workspace design that we had seen at ST or TI where everyone’s cubicle was same size and type; my friend’s office space design was more hierarchical in nature. 25-30% of space was designated for a closed CEO’s chamber while remaining 12 developers were seated in 50-60% of left over space.
In a knowledge economy, where talent is a precious commodity, things as subtle as this can make it difficult for you to hire and retain skilled employees. Which is what happened with this friend of mine where he really struggled to attract talent to the team and eventually had to close down. I believe this happened primarily because he had never been to any office, perhaps other than his own uncle’s and that lack of exposure cost him dearly.
Also while working, you get exposed to so many other aspects of running a business such as HR, Finance, leading and managing people, processes etc. – all of which come very handy when you start on your own. For example, in TI despite it being an open office, the payroll department was always a separate enclosure because people are not really comfortable talking/negotiating their salaries in open. What may seem an obvious now, may not be intuitive to someone without this experience. Hence, I always recommend that one should gain some corporate exposure before starting up on own.
4. Recently in one of your interviews at Techcircle, you said “Right now (we have) a team of 200 (excluding call centre), redBus plans to have 680 people on board by March 2013.” – how does the recruitment process at redBus work? Do you go to campuses for fresh hire or is it all laterals?
Majority of our recruitment is lateral as we look for people with experience who can hit the ground running and set things up for us. Having said that we do hire freshers also every year though that is a smaller number. This year for example we have hired Management graduates from IIM Ahmedabad, Indore and XLRI etc. While our engineering fresh graduates join us from campuses like IIIT, IIT Delhi etc.
5. What is redBus’s thought process on internships? Is it an integral part of your talent acquisition strategy? If yes, in what ways? And if no, why not?
Internships at the moment are not core of our talent acquisition strategy. Primarily because most of our hiring is lateral and partly because as a new business, there are so many things being figured out that we really have not been able to develop a concrete thought process and action plan around internships.  We have hired interns in past but the experience has not been very successful. For a successful internship, there is lot of investment, in terms of time and effort, that an organization must make and we so far have not managed it well.
One of the good projects that an IIM Indore intern did for us was  financial modeling of our daily/weekly cash flows which was supposed to help the company do a better job of budgeting and estimating.
6. From looking for a bus ticket yourself in 2005, to selling 1 Crore+ tickets till date, the 6 years journey at redBus must have been a big roller coaster ride; if there is one principle or individual trait that you believe has stood the test of time and you would like to share with students; it would be?

Always look at the glass half full. In your life there will be many glass half empty moments where you may be inclined to think more about the negative aspect of a situation or decision and I have had enough of these moments all along. What has helped is the ability to look at the positive side of things and move ahead – this not only makes you happier but also changes the mood in the room where everyone in the team starts feeling excited about the challenge ahead.

GATE 2013 Organising Institute is providing the facility of GATE Mock Test


These are MOCK TESTS only meant to give the candidate a feel for taking a Computer Based Test. Candidates should familiarize themselves with the instructions and how to use the interface before they come for the online exam on 20th January 2013.



If u want to attend then go to below link


Click Here


If u click on above link U can find individual links for different subjects and there by u can attend for those Mock tests.. All the best Guyzzzz..........

National Conference on Information & Communication Technolgies

Hi Guyz this is to inform u about national level Conference On "INFORMATION & COMMUNICATION SYSTEMS"..  @ Kongu Engineering College, ERODE, Tamilnadu...



For more Details vist this link...

BITS, GOA Technical fest..

Hi Guyz this information Regarding Tech Fest at

BITS, GOA..
on Feb 1-3,2013..




Foe more details plz Visit this Quark link...

click here

Wednesday, 26 December 2012

Summer Internship in Australia


Summer Internship in Australia – School of Electrical and Computer Engineering – RMIT University

RMIT University Summer Internship ProgramSchool of Electrical and Computer Engineering at RMIT University, Melbourne is inviting applications for paid summer research internships for 2013. The last date to apply is 1st February 2013– hurry!
About Internship: – The selected interns would undertake research and prepare a paper for publication in one of the following areas: -
  • Biomedical Electronics
  • Engineering Education
  • Industrial Automation and Control Systems
  • Information and Signal Processing
  • Micro/Nano Electronics and Sensors Technology
  • Microplatforms
  • RF and Antennas
# of Internships: – 2 (across programs)
Who can apply: – To be eligible for this scholarship you must:
  • Be an international undergraduate student from India or China
  • Be enrolled in the final year of your undergraduate degree program in your home country
  • Have achieved excellent academic results
  • Have a high level of English language skill (IELTS 6.5)
  • Demonstrate a high level of written expression in your application
  • Be available for a telephone interview as part of the selection process
Location: - RMIT University, Australia
Duration: -  8 weeks (between June and August 2013)
Stipend: – $500 for up to eight weeks + $1500 towards  airfares
How to apply: - Please refer to RMIT Summer Internship 2013 Page for more info and application details. The last date to apply is 1st  February 2013 – hurry!
back to top